Powerway's First Distributed EPC Project Successfully Connected to Grid

Veröffentlicht auf 03.12.2013
Powerway 
Dec. 3, 2013 - Recently, Powerway successfully connected its first distributed EPC project to the grid. The project is located in Sanshui industrial park, one of the 18 national photovoltaic demonstration areas, and only 5 km from Powerway's headquarters. 

Powerway succeeded in assuming the role of EPC contractor, responsible for the entire project: design, procurement, and construction. The company was able to complete the project, including debugging and interconnection, in ten days. 

The project's installed capacity is 28KW, with an annual energy output of 29,915KWh, which will avoid over 25 tons of carbon dioxide in the atmosphere every year.




Quelle: Powerway
ENF Profile von in diesem Artikel genannten Unternehmen

Powerway (Komponenten): https://de.enfsolar.com/powerway
Veröffentlichtung der PV Industrienachrichten ist kostenlos. Bitte senden Sie Ihre Nachrichten an