Geco Renewable Energy Set up a New Facility in Dali

Veröffentlicht auf 01.09.2016
Geco Renewable Energy 
Geco Renewable Energy has set up a new 1,000-meter workshop to produce aluminum solar mounting systems in Dali, Nanhai. Production equipment and facilities included two cutting lines, pressing machine, machining equipment and a mobile loading platform.

The new workshop is a complete manufacturing unit including production, inspection, pre-assembly, packing, loading and shipping. It saves time, increases production efficiency and raises Geco's capacity to 10MW per month. 


Mr. Binjian Zhong, Geco's CEO, said, "Since it was introduced to the market, our R&D-based aluminum solar mounting structures have enjoyed an excellent reputation from clients, because they are attractive, highly corrosion resistant and easy to install. In order to meet the booming orders from domestic and overseas customers, we decided to adjust our strategy and invest in a new workshop. We aim to seize more market share in the least time." 


Quelle: Geco Renewable Energy
ENF Profile von in diesem Artikel genannten Unternehmen

Geco Renewable Energy (Komponenten): https://de.enfsolar.com/geco-renewable-energy
Veröffentlichtung der PV Industrienachrichten ist kostenlos. Bitte senden Sie Ihre Nachrichten an